Design and development of pedal operated drip lateral winder

Author(s):
H Ganachari, O Mane, R Yadav, P Kadam, R Jagtap and S Kumbhar
Abstract:
In present study, pedal operated lateral winder mainly consists of Main frame, Sprocket and Chain, Shaft, Fixed wheel, Seat etc. The machine was design and developed at Dadasaheb Mokashi College of Agricultural Engineering and Technology, Rajmachi. The 100 m lateral with 1.30 m spacing between two laterals spread over 130 m2 area. The average time required for retrieving 100 m lateral by pedal operated drip winder was found to be 1.145 min while manually, it takes 1.40 min. Similarly, 150 and 200 m length of lateral was spread over 144 and 255 m2 areas for testing, respectively. Machine took 1.525 min and 2.31 min to retrieve the lateral for 150 and 200 m length of lateral, respectively. Also, for the same lateral, manually it took 2.30 and 3.205 min to retrieve the lateral, respectively. Average capacity of manually was 60, 69.23 and 60 meter per minute for 1st, 2nd and 3rd reading respectively. Similarly, average capacity of pedal operated drip lateral winder was 79.64, 80.35 and 79.99 meter per minute for 1st, 2nd and 3rd reading respectively. The average capacity of manually and pedal operated lateral winder was found to be 63.08 and 79.99 meter per minute. It was developed by locally available material with minimal cost of Rs. 4800/-.
Pages: 1970-1974  |  295 Views  136 Downloads


The Pharma Innovation Journal
How to cite this article:
H Ganachari, O Mane, R Yadav, P Kadam, R Jagtap, S Kumbhar. Design and development of pedal operated drip lateral winder. Pharma Innovation 2023;12(10):1970-1974.